top of page
image.png
image.png

Mass Save Weatherization - Clipper Ship Cove Condos 2026 Participant Confirmation Form

Clipper Ship Cove Condo residents who have signed up to participate in the Mass Save Weatherization offering; please complete the following form to confirm your enrollment. Building Weatherization for Clipper Ship Cove Condos: Cost breakdown: The total cost is $2,757, but after a $2,502 incentive, your net cost is just $255 (materials and installation included).

Estimated specs: 998 sq. ft., with estimated annual savings of $150–$299.

Scope of work includes:

  • Combustion safety testing for oil/gas heating and hot water systems

  • Air sealing (attic and basement penetrations, chases, duct work, etc.)

  • Basement/crawlspace wall insulation (2" rigid insulation on foundation walls, plus weatherstripping the access opening)

Do you own or rent this condo?
Own
Rent

Please read the following and confirm before proceeding:

Mass Save requires someone to be present at the home at the beginning of the weatherization install and at completion. Will you be able to provide access to your home in Clipper Ship Cove, either personally, or through a trusted friend/neighbor/caretaker?

Building Permit Authorization:


Cape Save is required to pull an Express Weatherization Permit for your home to complete Mass Save insulation upgrades. Please sign to authorize Cape Save to apply for an Express Weatherization Permit with the Town of Yarmouth for the address you provided at the beginning of this form.

Drawing mode selected. Drawing requires a mouse or touchpad. For keyboard accessibility, select Type or Upload.

Unit Specifics:

Unit Stories and Access Floor

Do you have any other work being done on your home that might interfere with insulating the attic/basement? Any leaks in the roof or foundation? Remodeling? Mold problems? Pests or mice?

Preferred Methods of Communication

Customer Co-Pay Information: Your estimated co-pay for will not exceed $255 You do not pay Cape Save; you will receive a bill from RISE Engineering (The RISE Group, Inc.) 60-90 days after we've completed the project. Once you've submitted your confirmation, Cape Save will contact you via email to arrange scheduling your installation.

Please note: you do not need to submit this form more than once.
Once I press submit, I understand I do not need to submit this form again.
Cape Save Logo transparent.png

info@capesave.com

508-398-0398

7-D Huntington Avenue, So. Yarmouth, MA 02664

Fully Licensed & Insured. Certifications: BPI BA-T, Lead-Safe, OSHA

HBRACC-65th-Logo.png

© Cape Save 2024

bottom of page